The complex provides intake, storage, drying, and dispatch of large volumes of grain by both road and rail, with the capability to form a full unit-train (52–54 railcars) within a single day.
- Type of property: industrial & storage facility (grain elevator, unit-train terminal)
- Total storage capacity: 151,900 tons
- Reinforced-concrete silos — 85,000 t
- Mechanized flat warehouses — 35,700 t
- Non-mechanized flat warehouses — 31,200 t
Grain intake and dispatch capacities
- Intake by trucks: 4,000 t/day
- Intake by rail: 3,200 t/day
- Dispatch by trucks: 1,200 t/day
- Dispatch by rail: 1,800 t/day
Unit-train station: YES
Full train loading within 24 hours is available.
Technical infrastructure
Grain dryers:
Total drying capacity: 1,500 t/day
Land plot: 21.6038 ha (leased until 25.10.2037)
Laboratory: certified, fully equipped
Railway infrastructure:
- 9 rail tracks with total length of 4,204 m
- 3 simultaneous railcar loading lines
- 2 shunting winches (operational)
- Own industrial locomotive TGM-40-01 (excellent condition)
Utilities and safety
- Water supply: well + water tower (stable pressure)
- Sewage: cesspits
- Fire safety: two fire reservoirs (500 m³ each)
- Own fire truck — additional safety and rapid response capability
Location and logistical advantages
- Located in central Ukraine, Kirovohrad region, city of Pomichna
- Convenient railway hub ensuring efficient logistics for high grain volumes
- Optimal connections to southern seaports and major export corridors
- Capability for unit-train dispatch, offering one of the highest performance levels in the region
Key advantages for investors
- Storage capacity exceeding 150,000 tons — a strategic asset for traders, agro-holdings, and exporters
- Fully operational engineering, logistics, and weighing infrastructure
- Unit-train loading capacity of 52–54 railcars/day
- Own locomotive — control and speed of internal logistics
- Long-term land lease — stability and predictability